BOBALONG KAOLIN PROJECT

Western Australia

  • 5 GRANTED TENEMENTS COVERING 396KM2 NEAR TAMBELLUP WA
  • TARGET OF +10MT HIGH-GRADE RESOURCE TO SUPPORT 350KTPA (30 YEARS)
  • ADVANCED PROJECT WITH DRILLING AND SCOPING STUDY COMPLETED ON TWO AREAS
  • KAOLIN SAMPLES TESTED AT INTERTEK GENALYSIS IN AUSTRALIA AND WUHAN UNIVERSITY OF TECHNOLOGY IN CHINA
  • DSO EXPORT POTENTIAL VIA 133KM SEALED ROAD TO THE DEEPWATER PORT OF ALBANY
  • RECENT DRILLING CAMPAIGNS COMPLETED AT BILL’S MIDDLE AND TAMBELLUP EAST
  • HIGH WHITENESS, HIGH BRIGHTNESS – 80% TO 85% BRIGHTNESS, 38.3% AL2O3 AND 45.9% SIO2
  • SMALL PARTICLE SIZE, HIGH OPACITY AND LOW IMPURITY RESULTS INDICATE HIGH VALUE PRODUCTS
  • PRODUCT SUITABLE FOR DIRECT SHIPPING ORE (DSO) OPERATION WITH BASIC BENEFICIATION (TO REMOVE SILICA)
  • ONGOING EXPLORATION PROGRAM CONSISTING OF DRILLING, BULK SAMPLING FOR PRODUCT TESTING AND FEASIBILITY STUDIES