Quarterly Activity and Cashflow Report
Released
Released
Announcement PDF
ASX Announcement
4 April 2024
QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2024
HIGHLIGHTS
•
•
Rock chip assays from Adina East and Lac Rug Lithium Projects received; Highlights include:
o
Significant rubidium enrichment up to 658 ppm indicative of an LCT fractionation trend
o
Key “fractionation ratios” of K/Rb below 100 suggest the potential for a spodumenebearing pegmatite to have been generated in the area
o
Fractionation trends observed will guide further exploration in Q2/Q3 2024
Exclusive option entered for Manna West Lithium Project in the Eastern Goldfields of WA
o
The project is 3.5km west of Global Lithium’s (ASX:GL1) Manna Lithium Project (36.0Mt
at 1.13% Li2O)1
o
Favourable project geology includes both granites and greenstones prospective for
lithium and gold mineralisation
o
Regional soil sampling program conducted during the quarter over the project area to
assess lithium, gold and rare earth mineralisation
o
Assay results expected Q2 2024
•
Satellite analysis of the recently granted Wirrulla Uranium and REE Project in South Australia
produced a cluster of uranium targets within the Narlaby paleochannel, 10km from the highgrade Yarranna Prospect (3,550ppm U3O8 over 1m from 66m (IR1377))2
•
Program of Environmental Protection and Rehabilitation (PEPR) application submitted before
planned uranium and REE drilling program at Wirrulla (North)
o
•
Analysis of drill core for rare earth elements from historical holes drilled at Wirrulla Project
(South) underway with XRF and assay results expected Q2 2024
o
•
Targeting clay horizons with ionic absorption Rare Earth Element (REE) mineralisation
Program of Works (POW) lodged for Capel Mineral Sands WA drilling program
o
•
Planned program to consist of between 10 to 20 AC/RC holes to test for uranium in the
regionally significant Narlaby paleochannel
2,000m drilling program for targeting ilmenite mineralisation to commence in Q2 2024
Strong financial position with a cash balance of AU $1.864m as at 31st of March 2024
Pinnacle Minerals Managing Director, Nic Matich, commented:
“Following on from our transformative acquisition of the Adina East Lithium Project in the final quarter
of 2023, Pinnacle has rapidly progressed transitioning to a technology and battery metals explorer. The
Company has spent the current quarter planning and executing an exploration plan that provides
current and future investors with exposure to several critical commodities and projects at various stages
of the exploration cycle. The Company is excited to deliver upon its 2024 exploration plan and the
exploration results that it will bring.”
Pinnacle Minerals Ltd
Issued Capital
Australian Registered Office
Directors
ACN: 655 033 677
ASX: PIM
45,463,317 Shares
44,867,271 Options
Unit 6, Level 1, 389 Oxford Street
Mount Hawthorn WA 6016
T: + 61 8 9426 0666
E: admin@pinnacleminerals.com.au
WILLIAM WITHAM – Executive Chairman
NIC MATICH – Managing Director
LINCOLN LIU – Non-Executive Director
STEPHEN ROSS – Non-Executive Director
www.pinnacleminerals.com.au
Pinnacle Minerals Ltd (ASX: PIM) (“Pinnacle”, or the “Company”) is pleased to provide the following update on
its activities for the quarter ending 31st of March 2024 (“Quarter”, “Reporting Period”).
During the Quarter, the Company received assay results from its James Bay and Abitibi Lithium Projects in
Québec Canada. The results stemmed from last autumn’s brief reconnaissance program conducted in late
2023, at the onset of the Canadian winter.
Assay results from rock chip samples (Table 1 and Table 2) from the Adina East and Lac Rug projects taken in a
short time frame just before winter set in, did not return lithium enrichment. However, significant rubidium
enrichment, up to 658 ppm was obtained on a granitic pegmatite, indicative of magmatic fractionation which
is a precursor to lithium saturation. Importantly, at Adina East, key “fractionation ratios” of K/Rb below 100
suggest the potential for a spodumene-bearing pegmatite to have been generated, trending northwest into the
project's metasedimentary rocks, like those that host Loyal Lithium’s (ASX:LLI) Trieste discovery 5 kms to the
west. The Trieste discovery recently produced drilling intercepts of 31.8m at 2.2% Li2O3.
To further strengthen the Company’s Lithium portfolio an exclusive option4 was entered into on the Manna
West Lithium Project in the Eastern Goldfields of Western Australia. The project is favourably located 3.5km
West of Global Lithium’s (ASX:GL1) Manna Lithium Project (36.0Mt at 1.13% Li2O) and is situated within granites,
greenstones and meta-sedimentary rocks prospective for lithium mineralisation.
The company rapidly mobilised to Manna West upon signing the option and undertook a regional soil sampling
program, submitting 215 samples for ultrafineTM analysis. The assay results will determine if the option to
acquire the project is exercised. The structure of this transaction has provided the company with a low-cost
entry into a proven lithium province in a tier 1 jurisdiction.
Progress was also made at the Company’s newly granted Wirrulla Project in South Australia, with satellite
analysis and follow up fieldwork identifying numerous uranium targets within the Narlaby Paleochannel, 10km
from the high-grade Yarranna Prospect held by IsoEnergy (CVE:ISO). The Narlaby Paleochannel will be targeted
in an upcoming drilling program with the associated environment protection and rehabilitation (EPEPR / PEPR)
plan for a 10 to 20 hole program being lodged with the South Australian Energy and Mines Department during
the quarter.
Pinnacle also lodged a program of work (POW) application for a c.95 hole 2,000m drilling campaign at the
company’s brownfield Capel Mineral Sands Project in Western Australia where historical exploration by Iluka
delivered shallow heavy mineral intercepts including 21m at 3.3% HM from surface5.
The Company maintains a strong cash position with AU $1.864m cash on hand as at the end of the quarter.
www.pinnacleminerals.com.au
2
OPERATIONS
Canadian (Québec) Projects
Adina East Lithium Project - Background
The Adina East Project is located in Québec’s James Bay region (Figure 1) with a total of 147 claims encompassing
72.7km2 (7,274.47 ha) adjacent to an interpreted extension of the Trieste greenstone belt ( Figure 3). Located
within Category-III lands, the Adina East Project does not carry any restrictions relating to mining or exploration
according to the James Bay Agreement with the Cree Nation.
The Project is adjacent to Loyal Lithium’s (ASX:LLI) Trieste project where spodumene-bearing dykes with
intercepts including 31.8m at 2.2% Li2O6 have been drilled less than 6km from the boundary of the Project.
Adina East is also adjacent to Winsome Resources’ Tilly Project where swarming pegmatites have been mapped7
and are interpreted to extend into the Adina East Project. The claims are readily accessible throughout the year
from Mirage Outfitters and the Renard diamond mine (75km to the northwest and 45km to the South of the
Project respectively), with the proposed La Grande Alliance eastern road mapped to pass through the Project.
Multiple mapped pegmatites exist within the Project area. These pegmatites are located approximately 24 km
along strike east in the same stratigraphic sequence and location that hosts the Winsome Resources’ (ASX:WR1)
Adina Lithium Project, which has a mineral resource estimate of 59Mt at 1.12% Li2O8 and includes high grade
intercepts of up to 4.19% Li2O over 4.1m.9
Figure 1: James Bay Province Highlighting Adina East Project Location.
www.pinnacleminerals.com.au
3
Adina East Lithium Project - Activities
During the quarter assay results from rock chip samples from Adina East taken in a short time frame just before
winter set in were received. The results did not return lithium enrichment, however, significant rubidium
enrichment, up to 658 ppm was obtained on a granitic pegmatite, indicative of magmatic fractionation which
is a precursor to lithium saturation. Importantly, key “fractionation ratios” of K/Rb below 100 suggests the
potential for a spodumene-bearing pegmatite to have been generated, trending northwest into the project's
metasedimentary rocks, like those that host Loyal Lithium’s Trieste discovery (includes drilling intercepts of
40.0m at 1.2% Li2O1) 5 kms to the west.
K/Rb ratios for Adina East are presented in Table 1 and mapped in Figure 3. The map highlights the ratio
reducing the further north / northwest the sample is located. Spodumene fields typically occur where the K/Rb
ratio < 100 and Cs > 500ppm or Rubidium > 1000ppm (Figure 5). A stylised schematic is shown in Figure 4.
Pinnacle has interpreted that the late-stage granite intrusions highlighted as Tonalite and Granodiorite (Lake
Salò Intrusion and Joubert Suite) in Figure 3 could be a Parental granite with which to radiate prospecting out
of, to identify potential Spodumene fields.
Table 1: Adina East - Select Assay Results, a result of “0” is below detection limit.
Cs
CsO2
Li
Li2O
Ta
Ta2O5
Be
BeO
Rb
Nb
Sn
Ga
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
82
42
45
31
67
4
5
0
0
658
9
3
24
140
7
7
0
0
1
1
5
14
178
0
5
21
146
21
23
0
0
3
3
0
0
474
5
4
16
5907618
157
27
29
24
52
7
9
4
11
267
33
3
25
696709
5904797
225
18
19
0
0
1
1
0
0
342
0
6
18
160090005
696294
5904473
266
5
6
0
0
17
21
0
0
128
24
5
17
160090009
692176
5902786
272
7
8
0
0
2
3
3
8
147
7
4
16
160090052
709648
5905559
307
3
3
15
32
1
1
0
0
95
6
3
21
160090056
690979
5901153
307
10
11
0
0
1
2
0
0
192
3
1
17
160090057
691307
5900939
313
5
5
0
0
1
1
0
0
99
4
1
13
160090011
696395
5901466
342
2
3
0
0
1
1
0
0
158
3
2
12
160090008
696506
5905740
368
2
3
16
34
1
1
0
0
114
5
3
14
160090058
692514
5900389
369
3
3
0
0
1
1
0
0
65
0
1
16
Sample
Easting
Northing
160090055
695484
5907108
160090051
695775
5906865
160090004
696351
5904850
160090054
699226
160090007
K/Rb
During the quarter the Company began engaging consultants and contractors in preparation for its northern
summer field season. The field season will begin in Late May early June with a LIDAR survey of the entire project.
High resolution orthophotos taken simultaneously with the LIDAR readings will be draped over the digital
elevation model (DEM), enabling the identification of potential pegmatite outcrops which often show up as
“evident” white elevated “areas”, as tested by Pinnacle’s contractor on numerous other projects (Figure 2).
The results of the LIDAR program will be used to guide the summer field campaign and should significantly
reduce the time and associated cost to conduct a thorough field review of the claim package by eliminating
claims where there are no evident outcrops.
www.pinnacleminerals.com.au
4
Pegmatite outcrop
Figure 2: Example of successful identification of a pegmatite outcrop (ASX:MRZ - Bohier Project)
Increasing
Fractionation
Figure 3: K/Rb Ratios - Adina East
www.pinnacleminerals.com.au
5
Spodumene field
Figure 4: Schematic model in profile that shows regional zoning patterns in a pegmatite field. Characteristic rare-element suites of the most
enriched pegmatites in each zone are indicated. The most prospective pegmatites are in distal areas compared to the parental granite
(modified after Duuring, Rare Element Pegmatites: A mineral systems analysis, GSWA).
Most Adina East samples
Prospect
Deposit
Figure 5:10 Chemistry of feldspars in pegmatites from the Québec’s James Bay area as measured with a portable XRF. The rubidium over
potassium differentiation trend is discernible on the left, with the spodumene bearing dykes in red. Measurements on Adina samples
dominantly plots in the blue field.
www.pinnacleminerals.com.au
6
Lac Rug and Lac Bigniba Projects – Background
The Lac Rug Project is centred 26km south-east of Lebel sur Quevillon township, Abitibi, Québec. The project
consists of 207 claims covering a surface area of approximately 116.5km2, which are in the process of being
transferred to the company’s 100% owned subsidiary Pinnacle Abitibi Mining Limited. The geological area of
the project is favourable for primarily lithium and beryl, but also gold, zinc and base metals.
The Lac Bigniba Project is centred 60kms NNE of Amos and 46km west of Lebel-sur-Quevillon township, Abitibi,
Québec. The Geant Dormant Gold Mine (421,600 Oz at 8.08g/t gold11) is located 12kms to the west of the project
area. Lac Bigniba consists of 282 claims covering a surface area of approximately 154.7km2.
Figure 6: Abitibi Province highlighting Lac Rug and Lac Bigniba Project locations.
Lac Rug and Lac Bigniba Project - Activities
During the quarter assay results from rock chip samples (Table 2) from Lac Rug were received. The results are
encouraging with several K/Rb ratios below 100. Fractionation tends to increase to the southwest, with this
data used in conjunction with existing LIDAR data over the project to be used in guiding further exploration.
Table 2: Lac Rug - Select Assay Results, a result of “0” is below detection limit.
Cs
CsO2
Li
Li2O
Ta
Ta2O5
Be
BeO
Rb
Nb
Sn
Ga
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
72
6
7
58
125
7
8
4
11
221
35
11
32
77
6
7
54
116
8
10
0
0
220
47
14
29
5409112
90
21
22
0
0
42
51
0
0
376
40
2
22
380523
5407523
117
12
13
0
0
21
26
0
0
367
53
2
31
160990055
380685
5410395
120
9
10
36
77
4
5
0
0
308
13
3
23
160990051
380788
5408007
122
14
14
0
0
14
16
0
0
518
50
2
22
160990006
380302
5407731
141
6
6
0
0
2
2
0
0
227
15
4
21
160990053
380086
5407874
143
9
10
0
0
11
13
0
0
518
8
1
16
160990005
380755
5408068
150
4
4
20
43
8
10
0
0
113
43
3
23
160990054
381332
5408953
155
1
1
0
0
8
9
0
0
58
20
4
22
160990052
380670
5407952
166
2
2
41
88
3
4
0
0
18
4
1
13
Sample
Easting
Northing
K/Rb
160990009
380699
5410181
160990004
380544
5409934
160990003
381210
160990007
www.pinnacleminerals.com.au
7
South Australian Projects
Background on the Wirrulla and White Knight Projects
The newly granted Wirrulla Project (EL 6968) is 957km2 of tenure in the northwestern extents of the Eyre
Peninsula South Australia. The project is centred on a circular magnetic feature resembling a Mount Weld style
intrusion and was applied for in July 2023 primarily for its’ rare earth element (REE) potential which was
identified from historical drilling intercepts where elevated apatite > 10% (typical in carbonatites) were
intercepted12.
The REE ionic absorption potential of the Narlaby palaeochannel has also been identified by Cobra (COBR.LON)
who have defined the Boland Ionic Rare Earth Project which is hosted with-in the palaeochannel. Cobra has
recently acquired tenements EL6966 and EL6967 which cover a substantial portion of the palaeochannel.
Desktop studies undertaken whilst the tenement was under application have highlighted the uranium
prospectivity in the northern extents of the tenement where the uranium-bearing Narlaby paleochannel is
mapped continuing into the tenement. The palaeochannel hosts high grade uranium mineralisation at
Yarranna only 10km from the targets identified by satellite and radar imagery analysis conducted by Pinnacle.
The White Knight Project covers a total area of 1,148km2 on the western side of the Eyre Peninsula, and is
strategically located adjacent to Andromeda Metals (ASX:ADN) high-grade Mount Hope Kaolin Project and Oar
Resources (ASX:OAR) high-grade Gibraltar Kaolin-Halloysite Project. Extensive kaolin has historically been
recorded at the White Knight Project but has not been followed up with modern exploration techniques.
Activities
Wirrulla Uranium / REE Project
During the quarter the Company released results of satellite and radar imagery analysis of the Wirrulla Project
highlighting the potential for uranium (U3O8) mineralisation within the Narlaby paleochannel which is mapped
to extend into the Project area both in the north and centrally. This Palaeochannel is linked to IsoEnergy’s
(ISO.CVE) Yarranna Uranium Project which has significant uranium intercepts of up to 3,550ppm U 3O8.
Correlating synthetic aperture radar (SAR) and Sentinel (captured on the 16 th of June 2007 and 7th of October
2023 respectively) with the Yarranna uranium prospects (1 through 4), Dirt Exploration generated numerous
targets (Figure 7), of which a cluster less than 10km from the Yarranna prospects are considered the most
prospective. This cluster overlies and is adjacent to an interpreted extension of the Narlaby paleochannel which
hosts the Yarranna mineralisation.
The Company undertook a field reconnaissance trip to the Project to review access to areas of the tenement
prospective for both Uranium and REE mineralisation. Several landowners were consulted with a key access
agreement signed. Subsequently an environment protection and rehabilitation (EPEPR / PEPR) plan was lodged
with the South Australian Department for Energy and Mining on the 14 th March 2024. Upon approval of the
PEPR, Pinnacle will look to engage drilling contractors to conduct first pass exploration of the Narlaby
paleochannel.
White Knight Project
During the Reporting Period the Company did not undertake any on-ground exploration at the White Knight
Project.
www.pinnacleminerals.com.au
8
Figure 7: Wirrulla Project highlighting uranium mineralisation and targets
www.pinnacleminerals.com.au
9
West Australian Projects
Capel Mineral Sands Project
Background on the Capel Mineral Sands Project
The project was previously held by Tronox Limited (NYSE:TROX), a global, vertically integrated producer of
titanium dioxide and inorganic chemicals, with a US $2b market capitalisation.
Previous, regional-scale exploration, conducted in 2010 by Iluka Resources Limited, discovered moderategrade HM from surface on several drill lines. Pinnacle believes there is potential for defining cohesive
mineralisation at a more local scale, sufficient for delineating an appreciable mineral resource, within the
tenement.
Activities
During the Reporting Period, preliminary modelling of the Ruabon beach placer was undertaken with a drilling
program designed to test the continuity of mineralisation. Key landholders were approached, with land access
agreements signed over the areas of interest. Program of Works (POW) applications have been lodged and the
Company is expecting these applications to be approved imminently. Pending POW approvals, the Company
plans to conduct a c.95 hole, 2,000m drilling program with the aim of defining an ilmenite dominated heavy
mineral resource.
Figure 8: “Capel” Project Map
www.pinnacleminerals.com.au
10
Manna West Lithium Project
Background on the Manna West Lithium Project
The Manna West Project is situated within granites, greenstones and meta-sedimentary rocks in the Eastern
Goldfields of Western Australia. The lithium mineralisation exploration model is based on fractionated
pegmatites intruding the metasediments driven by the LCT-rich Cardunia Syenogranite which has multiple
mapped spodumene-bearing pegmatite occurrences surrounding it, including Global Lithium Resources
Limited (ASX:GL1) Manna deposit (36.0Mt at 1.13% Li2O).
The project is readily accessible via graded tracks from Kalgoorlie and access is set to be further upgraded by
Global Lithium Resources as they develop their Manna Project infrastructure.
Activities
During the quarter Pinnacle entered into an exclusive option agreement to acquire the Manna West Lithium
Project. Key acquisition terms are detailed in Pinnacle’s ASX announcement dated the 19th of February 2024.
Subsequent to signing the option agreement, Pinnacle mobilised to the Project and conducted a broad-based
regional soil sampling program, submitting 215 samples for analysis. The samples are undergoing ultrafine
analysis for lithium, gold and rare earth mineralisation. The assay results will determine if Pinnacle exercises
the option to acquire the project.
Figure 9: Manna West Project
www.pinnacleminerals.com.au
11
Figure 10: Manna West Project highlighting regional geology and projects
www.pinnacleminerals.com.au
12
“Great Southern Projects”
Background on the Bobalong and Holly Projects
The Bobalong project consists of four granted tenements totalling 298.72 km2. Prior exploration by the
company for Kaolin has highlighted the potential for a DSO project at Bills Middle.
A drilling campaign conducted by the Company in 2023 at the Disruptor Prospect uncovered a previously
unknown intrusive complex with anomalous nickel and REE mineralisation.
The Holly Project consists of two granted tenements covering 136.8km2 with an Exploration Target of between
140mt and 350mt of kaolin13 with a brightness of 74% to 84%. The project is yet to be extensively explored by
the Company.
Holly Project
During the quarter, no physical exploration was undertaken.
Bobalong Project
During the quarter, no physical exploration was undertaken.
An Exploration Incentive Scheme (EIS) Co-Funding application (Round 29) for a single “deep” hole at the
Disruptor Prospect was made. Successful applicants will be notified in April 2024 with applicants having from
1st June 2024 until the 31st of May 2025 to conduct the co-funded drilling program.
Pinnacles application was for a single 640m deep subvertical hole underneath DPRC004 and DPRC011 where
elevated nickel, TREO, chlorite, and k-feldspar alteration was observed.
Figure 11: Disruptor Prospect highlighting regional magnetics and faults
www.pinnacleminerals.com.au
13
CORPORATE
Capital Structure
During the Reporting Period 500,000 director performance options with a strike price of 25c vested.
Cash Position
Pinnacle maintained a strong cash position at Quarter’s end, with a cash balance of A $1.864 million.
References
1 – Global Lithium Limited (ASX:GL1) ASX announcement 26th of July 2023
2 – Open File Envelope No. 4010, Carpentaria Exploration Co. Pty Ltd, 1984
3 – Loyal Lithium Limited (ASX:LLI) ASX announcement 21st of March 2024
4 – Pinnacle Minerals Limited (ASX:PIM) ASX announcement 19th of February 2024
5 – Wamex Report Number – A97325
6 – Loyal Lithium Limited (ASX:LLI) ASX announcement 21st of March 2024
7 – Winsome Resources Limited (ASX:WR1) ASX announcement 19th of April 2023
8 – Winsome Resources Limited (ASX:WR1) ASX announcement 11th of December 2023
9 – Winsome Resources Limited (ASX:WR1) ASX announcement 14th of February 2023
10 – Réjean Girard (IOS Géosciences), Exploration for lithium: Geochemical Approaches, Québec Mines and
Energy 2023, 22nd of November 2023
11 – Inferred and indicated resources, https://abcourt.ca/en/projects/geant-dormant/ and Pinnacle calculations
12 – Pinnacle Minerals Limited (ASX:PIM) ASX announcement 19th of July 2023
13 – Exploration Target Okapi Resources Ltd Holly Kaolin Project, Auranmore Consulting June 2021
This announcement has been authorised for release by the Board of Pinnacle Minerals Ltd.
For further information, please contact:
Executive Chairman
William Witham
Pinnacle Minerals Limited
T: + 61 (0) 475 870 345
E: admin@pinnacleminerals.com.au
Managing Director
Nic Matich
Pinnacle Minerals Limited
T: + 61 (0) 475 870 345
E: admin@pinnacleminerals.com.au
Media and Investor Inquiries
Jane Morgan
Jane Morgan Management
+61(0) 405 555 618
E: jm@janemorganmanagement.com.au
www.pinnacleminerals.com.au
14
About Pinnacle Minerals
Pinnacle Minerals Ltd (ASX: PIM) is an ASX listed technology minerals company focused on delivering
shareholder value via the systematic exploration and development of its portfolio of battery and technology
metals projects in Canada, Western Australia and South Australia. Pinnacle aims to deliver exploration success
via systematic and geologically rigorous techniques. The Company’s focus is the “Adina East Project” in James
Bay, Québec which is proximal to the world class Adina Lithium Project (Winsome Resources: ASX:WR1) and
adjacent to the Trieste Lithium Project (Loyal Lithium: ASX:LLI) and the Tilly Lithium Project (ASX:WR1). The
Company’s Australian exploration assets are prospective for Rare Earth Elements, Uranium and Mineral Sands.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations,
estimates and projections as of the date on which the statements were made. This forward-looking information
includes, among other things, statements with respect to the Company’s business strategy, plans,
development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations,
mineral reserves and resources, results of exploration and related expenses. Generally, this forward-looking
information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’,
‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’,
‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such
statements are only predictions, and that the Company’s actual future results or performance may be
materially different. Forward looking information is subject to known and unknown risks, uncertainties and
other factors that may cause the Company’s actual results, level of activity, performance, or achievements to
be materially different from those expressed or implied by such forward-looking information.
Competent person statement
The information in this announcement that relates to Exploration Targets, Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by William Witham, a Competent Person who is
a Member of The Australian Institute of Geoscientists (AIG). William Witham is a director of Pinnacle Minerals
Ltd. William Witham has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. William Witham consents to the inclusion in the presentation of the matters based on his information
in the form and context in which it appears.
Figure 12: Pinnacle Minerals Projects' Location Map
www.pinnacleminerals.com.au
15
ASX Additional Information
1.
ASX Listing Rule 5.3.1 – Mining exploration activities and investment activity expenditure during the quarter was
$222,022. Full details of the activity during the quarter are set out in this report.
2.
ASX Listing Rule 5.3.2 – Mining production and development activity expenditure for the quarter was Nil and
there were no substantive mining exploration activities for the quarter.
3.
ASX Listing Rule 5.3.3 – Tenement Schedule
Australia:
Project
Bobalong
Bobalong
Bobalong
Bobalong
Holly
Holly
Capel
Manna West*
White Knight
White Knight
White Knight
White Knight
Wirrulla
Holder
Witby Clays Pty Ltd
Witby Clays Pty Ltd
Pinnacle Minerals Ltd
Pinnacle Minerals Ltd
Bullseye Geology Pty Ltd
Bullseye Geology Pty Ltd
Pinnacle Minerals Ltd
Mr. Robert Anderson
Mr. Peter Brady
Open Minerals Pty Ltd
Pegasus Prospecting Pty Ltd
Pegasus Prospecting Pty Ltd
Titan Exploration Pty Ltd
REE Exploration Pty Ltd
State
Tenement
Status
Percentage
Held
WA
WA
WA
WA
WA
WA
WA
E70/5347
E70/5348
E70/6440
E70/6441
E70/5676
E70/5690
E70/6372
Granted
Granted
Granted
Granted
Granted
Granted
Granted
100%
100%
100%
100%
100%
100%
100%
WA
E28/2694
Granted
N/A
SA
SA
SA
SA
SA
EL6789
EL6790
EL6939
EL6791
EL 6968
Granted
Granted
Granted
Granted
Granted
100%
100%
100%
100%
100%
*Project is under exclusive option
Canada:
Adina East Project (75% ownership)
Title Number
NTS Sheet
Area (ha)
Acquisition Date
Anniversary
Date
Registered Holder
2690971 - 2690982
2690984 - 2691013
2691015 - 2691029
2691031 - 2691060
2691062 - 2691076
2691078 - 2691096
2692398 - 2692408
2692410 - 2692418
23E04
23E04 & 23E05 & 33H01
33H01
33H01 & 33H08
33H08
33H08
23E05
33H08
619.26
1,547.88
774.34
1,548.19
773.71
979.71
567.26
464.12
21/11/2022
21/11/2022
21/11/2022
21/11/2022
21/11/2022
21/11/2022
24/11/2022
24/11/2022
20/11/2025
20/11/2025
20/11/2025
20/11/2025
20/11/2025
20/11/2025
23/11/2025
23/11/2025
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
ED Spod 1 Corp
Lag Rug Project
Title Number
NTS Sheet
Area (ha)
Acquisition Date
Anniversary Date
Registered Holder
2791764 - 2791869
2791977 - 2792012
2792073 - 2792112
2792151 - 2792164
2792333 - 2792343
32C15
32C15
33F06
33F06
32C15
5,997.57
2,039.66
2,267.53
718.32
623.86
09/09/2023 – 11/09-2023
12/09/2023
13/09/2023
13/09/2023
14/09/2023
08/09/2026 – 10/09-2026
11/09/2026
12/09/2026
12/09/2026
13/09/2026
Stuart Deveau
Stuart Deveau
Stuart Deveau
Stuart Deveau
Stuart Deveau
www.pinnacleminerals.com.au
16
Lac Bigniba Project
Title Number
NTS Sheet
Area (ha)
Acquisition Date
Anniversary
Date
Registered Holder
2792768 - 2792845
2792897 - 2792944
2793029 - 2793077
2793101 - 2793137
2793204 - 2793239
32C14 & 32F03 & 32F04
32C13 & 32F03 & 32F04
32F03 & 32F04
32F04
32F04
4,406.44
2,712.09
2,765.57
2,008.82
2,032.13
17/09/2023
18/09/2023
19/09/2023
20/09/2023
21/09/2023
16/09/2026
17/09/2026
18/09/2026
19/09/2026
20/09/2026
Stuart Deveau
Stuart Deveau
Stuart Deveau
Stuart Deveau
Stuart Deveau
Use of Funds
1.
ASX Listing Rule 5.3.4 – The Company provides the actual vs proposed use of Funds as outlined in Section 5.7 of
the Prospectus dated 31 January 2022. In December 2023, the Company received $707,000 for an offtake
prepayment from the E&D Fund.
Share your feedback
Discover