PIM ADVANCES US ANTIMONLY QUEEN WITH INTITIAL EXPLORATION
Released
Released
Announcement PDF
ASX Announcement
5 December 2025
Pinnacle Minerals Ltd Issued Capital Australian Registered Office Directors
ACN: 655 033 677
ASX: PIM
115,563,613 Shares
59,887,411 Listed Options
Unit 6, Level 1, 389 Oxford Street
Mount Hawthorn WA 6016
T: + 61 8 9426 0666
E: admin@pinnacleminerals.com.au
WILLIAM WITHAM –-Executive Chairman
LINCOLN LIU – Non-Executive Director
STEPHEN ROSS – Non-Executive Director
www.pinnacleminerals.com.au
PINNACLE ADVANCES U.S ‘ANTIMONY QUEEN’ PROJECT
WITH INITIAL EXPLORATION PROGRAM
Fieldwork underway at historic antimony-gold in Washington State,
expanding American critical minerals portfolio.
HIGHLIGHTS
• Exploration activities have commenced across the Antimony Queen Project, targeting the
historic underground antimony-gold workings within the Gold Creek District, Washington
State, USA.
• The Project contains multiple historic adits and more than 1,000 feet of underground
development, providing a brownfields platform where proven structures and mineralisation
can be rapidly followed up with modern exploration.
• Antimony Queen represents a brownfields opportunity located within a district that
historically produced approximately 1,000-1,050 tonnes of antimony-bearing ore from
underground and surface workings (non-JORC historical estimates, see cautionary statement)
• Historical mining records confirm a multi-commodity-multi system comprising antimony, gold,
silver, lead, zinc and tungsten, supporting the potential for broader mineralisation styles
across the Project area.
• Initial fieldwork has been completed, including on-ground geological mapping and sampling
designed to confirm mineralisation and validate the extend of historical underground and
surface workings
• Historical sampling datasets are currently under reviewed to assess the reliability of rock-chip
and channel samples collected from Antimony Queen adits and surface diggings, with this work
supporting development of a modern 3D model of the historic workings
• This program represents the first systematic modern exploration undertaken at Antimony
Queen, enabling the application of contemporary geoscience techniques to a historically
productive district for the first time.
• Modern exploration targeting is underway, with airborne magnetic and satellite datasets being
processed to delineate structural controls and define new high-priority drill targets.
• U.S. consultants have been engaged, and discussions with local authorities are progressing to
establish the pathway and requirements for drill permitting.
• Assay results from current rock-chip and channel sampling are expected in the coming weeks
and will feed directly into geological modelling.
• The Antimony Queen claims cover approximately 500 hectares (5km²) and encompass a
historically productive antimony–gold district with extensive underground and surface
workings.
www.pinnacleminerals.com.au 2
• The Project is located within the recognised U.S critical minerals corridor, strengthening
Pinnacle’s position as a growing North American explorer focused on antimony and other
strategy minerals.
Pinnacle’s Executive Chairman, William Witham, commented:
“Our work at Antimony Queen presents a genuine opportunity to revitalise a historic U.S. antimony and gold
district using modern exploration techniques and technology. The early results from our Antimony Queen Gold
Creek fieldwork are highly encouraging and represent an important milestone as Pinnacle accelerates its
transition into an active U.S explorer within a rapidly expanding critical minerals portfolio.
“The verification of multiple historic workings, the extent of underground development, and the confirmation
of mineralisation across the project area reinforce both the quality of this asset and its strong discovery
potential. With assay results pending, geophysical datasets being processed and drill permitting progressing,
we are now building a clear pipeline of exploration catalysts.
“Antimony Queen strengthens our growing North American footprint alongside our Thunder Mountain Project
in Idaho, positioning Pinnacle to play an increasingly important role in the U.S supply chain for critical minerals.
We look forward to advancing exploration, defining high-priority drill targets, and delivering value for our
shareholders.”
Figure 1 Rock Sampling at Historical Adit 20 Nov 2025
www.pinnacleminerals.com.au 3
Cautionary Statement — Historical Estimate
The 1990 production figures for Antimony Queen are historical estimates compiled from public reports and
operator records listed in the JORC table in Table 1 of this announcement. Therefore, these historical figures
are not reported in accordance with the JORC Code (2012) and lack supporting data required under Appendix
5A (JORC Code) Table 1. A qualified person has not yet completed sufficient work to classify any as current JORC-
compliant Mineral Resources or Ore Reserves. The Company cautions investors that these figures are of a
historical nature and should not be relied upon for economic evaluation until verified through modern
exploration and estimation methods.
Pinnacle Minerals Limited (ASX:PIM) (“Pinnacle” or “the Company”) is pleased to announce the
commencement of the initial exploration program at its Antimony Queen Gold Creek Project in Okanogan
County, Washington, USA.1
Figure 2 - Antimony Queen, Location Map
1 ASX announcement - 15 October 2025, PIM to Acquire US Critical Minerals, Antimony & Silver Projects
www.pinnacleminerals.com.au 4
Location and History of Antimony Queen
The Antimony Queen Project sits within the historic Methow (Gold Creek) mining district on the slopes of
Middle Fork Ridge, in a largely undeveloped forest land administered by the U.S Forest Service (Figure 2). The
Project covers a significant portion of a recognized polymetallic antimony-gold system and represents one of
the most prospective brownfields antimony opportunities in the region.
Historic mining at Antimony Queen dates back to the early 1900’s, with the first recorded activity in 1907. The
operation developed multiple adits and more than 1,000 feet of underground workings, working east-striking
quartz sulphide vein systems typical of the broader Cascade Arc corridor. Historical records indicate 1,000-
1,050 tonnes of stibnite ore and antimony oxide were shipped between 1907 to 1941 reporting grades
averaging ~27% antimony (Hutting, 1956)2.
.
The district produced a suite of critical and precious metals including antimony, gold, lead, zinc, tungsten, and
silver, confirming the presence of a broad multi-commodity mineralised system.
Despite the long history of production, Antimony Queen has never been subject to systematic modern
exploration, providing Pinnacle with a rare opportunity to apply contemporary geological and geophysical
methods across a proven mineral system and established underground development.
Regional Exploration Targeting Prospectivity
The Antimony Queen and broader Gold Creek area are underlain by the Jurassic-Cretaceous Newby Group, a
package of greywacke and argillite units that hosts multiple structurally controlled mineralised vein systems.
Mineralisation occurs as veins of antimony and gold, often found together as stibnite and native
gold/electrum, in structurally controlled shear zones and fractures. The ore is found within intrusive and
metasedimentary host rocks and has undergone alteration through sericitization, silicification, and carbonate
replacement.
Mineralisation at Antimony Queen occurs as quartz-sulphide veins ad breccia zones containing stibnite
(antimony sulphide), and native gold/electrum and associated sulphides including pyrite and arsenopyrite.
Gold and antimony commonly occur intimately intergrown with a fine-grained gold often closely associated
with stibnite and arsenopyrite, a relationship characteristic of productive antimony-gold systems worldwide.
It is this style of geological setting, alteration signatures and mineral associations that point to a highly
prospective antimony-gold system with scope for significant extensions beyond the historically mined areas.
This provides the Company with a strong foundation for modern exploration and drill-targeting strategy.
2
Huntting, M.T., 1956. Inventory of Washington Minerals – Part II, Metallic Minerals. Washington Division of Mines and Geology Bulletin
37, Vol. 1, p. 18.
www.pinnacleminerals.com.au 5
Figure 3 - Field Sampling on historical workings on claims
Xtra Energy – Tenure Status and Claim Priority
The Gold Creek Claims, including the Antimony Queen area, were located by Fifty One Ventures on 27–28
April 2025. Subsequently, Rangefront attempted to locate claims on overlapping ground between 3–6 May
2025 on behalf of two parties:
• Xtra Energy Corp., an OTC-listed company with a current market capitalisation of approximately
US$115 million (covering surrounding ground); and
• SD&T Ltd., a private entity controlled by Xtra Energy’s Chairman (covering the central area around
Antimony Queen).
Under U.S. mining law, a properly located mining claim relates back to the date of location and is good as
against all subsequent locators. A junior claim is not valid if it overlaps ground that was already validly
located. Based on this principle, Pinnacle is confident that its 27–28 April 2025 claim locations are senior
rights superior to the subsequent, attempted claim locations submitted by SD&T and Xtra Energy Corp.
This position provides the Company with strong tenure security as exploration progresses and reduces
potential project-development risk associated with overlapping claims.
www.pinnacleminerals.com.au 6
Next Steps
• Assay results from current rock-chip and channel sampling are expected in the coming weeks, with the
results feeding directly into geological interpretation and refinement of priority target areas.
• These results will be integrated into the construction of a modern 3D model of the Antimony Queen
workings, which will guide the design of Pinnacle’s planned maiden drilling program. U.S.-based consultants
have been engaged, and discussions with local authorities are underway to confirm the pathway and
requirements for drill permitting.
• Further detailed surface mapping and geological sampling will continue across the Project alongside the
interpretation of airborne magnetic and satellite datasets currently being processed to delineate structural
controls and define new high-priority drill targets.
About Pinnacle Minerals
Pinnacle Minerals Ltd (ASX: PIM) is a technology minerals exploration company focused on creating shareholder
value through the discovery and development of high-quality battery and critical minerals projects in the United
States, Canada, Western Australia, and South Australia.
The Company’s U.S. projects are located in one of North America’s most prospective critical minerals regions
in Washington and Idaho, near Perpetua Resources’ world-class Stibnite Antimony-Antimony Project. Pinnacle
also holds assets in James Bay, Quebec, proximal to the Adina Lithium Project (ASX: WR1), and in Australia, the
Company’s exploration assets are prospective for rare earth elements (SA) and heavy mineral sands (WA).
This announcement has been authorised for release by the Chairman.
For further information, please contact:
Executive Chairman
William Witham
Pinnacle Minerals Limited
E: admin@pinnacleminerals.com.au
T: +61 417 097 172
Investor and Media Relations
Jane Morgan
Pinnacle Minerals Limited
E: jm@janemorganmanagement.com.au
T: +61 405 555 618
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations,
estimates and projections as of the date on which the statements were made. This forward-looking information
includes, among other things, statements with respect to the Company’s business strategy, plans,
development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations,
mineral reserves and resources, results of exploration and related expenses. Generally, this forward-looking
information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’,
‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’,
‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such
statements are only predictions, and that the Company’s actual future results or performance may be
materially different. Forward looking information is subject to known and unknown risks, uncertainties and
other factors that may cause the Company’s actual results, level of activity, performance, or achievements to
be materially different from those expressed or implied by such forward-looking information.
www.pinnacleminerals.com.au 7
Competent Person’s Statement
The information in this announcement that relates to geological information and historical production results
is based on information compiled by Mr. William Witham, MAIG, a Member of the Australian Institute of
Geoscientists and an employee of Pinnacle Minerals Limited. Mr. Witham has sufficient relevant experience to
qualify as a Competent Person as defined under the 2012 Edition of the JORC Code and consents to the
inclusion of the information in this report in the form and context in which it appears.
www.pinnacleminerals.com.au 8
JORC Code, 2012 Edition – Table 1
Section 1 - Sampling Techniques and Data
DISCLAIMER: Grades, masses and widths reported herein are historical estimates from primarily academic
sources and US Government Data and are not intended to imply the presence of a Mineral Resource as
defined under the JORC Code, 2012.
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where 'industry standard' work has
been done this would be relatively simple
(e.g. 'reverse circulation drilling was used to
obtain 1m samples from which 3kg was
pulverised to produce a 30g charge for fire
assay'). In other cases more explanation may
be required, such as where there is coarse
Antimony that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
No detailed sampling records exist for the
historical workings. Ore sales were recorded
by the Washington State Government.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face- sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
No drilling or related sampling data have been
reported.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
No drilling reported.
www.pinnacleminerals.com.au 9
Criteria JORC Code explanation Commentary
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or trench, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
No detailed logging data or resource
estimation from historical workings are
available. Historical production was reported
to the U.S. Government and forms the basis of
this report.
Sub- sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
No detailed logging data or resource
estimation from historical workings are
available. Historical production was reported
to the U.S. Government and forms the basis of
this report.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
Historical assay methods are not documented.
www.pinnacleminerals.com.au 10
Criteria JORC Code explanation Commentary
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
No drillholes were reported. Data from USGS
and Washington Geological Survey databases
were verified by the Competent Person.
Location of
data points
Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Historical workings verified by field inspection
against USGS data. No new drilling or resource
estimates are reported.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
applied.
No new drilling; data spacing not applicable.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
No drilling reported; orientation relationships
not determined.
Sample
security
The measures taken to ensure sample
security.
Historical sample security and auditing
methods are not recorded.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
Historical sample security and auditing
methods are not recorded.
www.pinnacleminerals.com.au 11
Section 2 - Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Project: Gold Creek District including the
Antimony Queen Project, Okanogan County,
Washington, USA. Ownership: Idaho Antimony
Corp Ltd. Tenure: Staked directly with the U.S.
Bureau of Land Management (June 2025).
Environmental: Located within the Okanogan-
Wenatchee National Forest; historical mining
area with no recorded heritage sites.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
Fieldwork conducted in November 2025 by
Cody Pink (Piton Exploration) under contract
to Pinnacle Minerals.
Geology Deposit type, geological setting and style of
mineralisation.
Deposit Type: Historical Antimony, gold and
tungsten lodes. Setting: Metamorphosed
sedimentary rocks. Mineralisation:
Structurally controlled and gold and antimony
sulphide -bearing veins.
Drillhole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
easting and northing of the drillhole collar
elevation or RL (Reduced Level - elevation
above sea level in metres) of the drillhole
collar
dip and azimuth of the hole
downhole length and interception depth
hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
References;
Barksdale, J.D., 1975. Geology of the Methow
Valley, Okanogan County, Washington.
Washington Division of Geology and Earth
Resources Bulletin 68.
Derkey, R. E., Huchton, M. & Ecology, W.A.,
1990. Gold Creek Area, Okanogan County:
Geology and Historical Mining Operations and
Practices. In: Washington State Department of
Ecology, Water Quality Assessment Report.
Ecology Publication No. 02-03-024, p. 74.
Purdy, C.P. Jr., 1951. Antimony Occurrences of
Washington. Washington Division of Mines and
Geology Bulletin 39, pp. 109–122.
www.pinnacleminerals.com.au 12
Criteria JORC Code explanation Commentary
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Huntting, M.T., 1956. Inventory of Washington
Minerals – Part II, Metallic Minerals. Washington
Division of Mines and Geology Bulletin 37, Vol.
1, p. 18.
Washington State Department of Natural
Resources, 1952. Directory of Washington Mining
Operations, 1952. Mines Directory, State of
Washington, pp. listing for Antimony Queen,
Okanogan County.
Washington State Department of Natural
Resources, 1922. Mineral Resources of
Washington. Washington Division of Mines
(GER), Bulletin 30.
Washington State Department of Ecology, 2010.
Antimony Queen Mine – Site Hazard Assessment.
Ecology Facility Site ID 1163525. Final report, 22
September 2010.
Mindat.org, 2025 Antimony Queen Mine, Gold
Creek, Methow Mining District, Okanogan County,
Washington, USA. Mindat Locality ID 19213.
Available at: https://www.mindat.org/loc-
19213.html
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cutoff grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
No new analytical or composited results
reported.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drillhole angle is known, its
nature should be reported.
Location and geological maps are provided in
this announcement. No assumptions of grade,
depth, or extent are made.
www.pinnacleminerals.com.au 13
Criteria JORC Code explanation Commentary
If it is not known and only the downhole
lengths are reported, there should be a clear
statement to this effect (e.g. 'downhole length,
true width not known’).
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include but not be
limited to a plan view of drillhole collar
locations and appropriate sectional views.
Appropriate location diagram is presented in
the text. The diagram is indicative only as no
assumptions of grade, extent or depth are
made.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
No Exploration Results are reported
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical survey
results; bulk samples - size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
No additional exploration or metallurgical
data are available at this early stage.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Planned work includes geophysical analysis,
field mapping, and definition of priority drill
targets for permitting.
www.pinnacleminerals.com.au 14
Share your feedback
Discover