LIDAR Survey Generates Multiple Pegmatite Targets at Adina
Released
Released
Announcement PDF
ASX Announcement
29 July 2024
LIDAR Survey Generates Multiple Pegmatite Targets at Adina East
HIGHLIGHTS
• Multiple pegmatite targets have been identified from recent LIDAR and orthophoto survey at the
Adina East Lithium Project in Québec, Canada
• Priority targets on the Western flank of the project are located within the same
metasedimentary rock sequence as the Loyal Lithium Trieste discovery (31.8m at 2.2% Li2O)1
• Eastern targets are interpreted to be an extension of the Tilly Pegmatites associated with the
Winsome Resources (WR1: ASX) Tilly discovery which yielded assays of 7m at 4.68% Li2O2
• No prior sampling has been conducted on the outcrops which stand out as high-quality regional
targets based on current data
• LIDAR combined with high resolution orthophotos has previously been successfully used in the
discovery of spodumene bearing Pegmatites in the James Bay region of Quebec
• Pinnacle is currently devising a field program to map and sample these targets with a view to
trenching and or drilling the targets should spodumene be identified
Pinnacle Minerals Ltd (PIM: ASX) (“Pinnacle”, the “Company”) is pleased to announce that multiple pegmatite
targets have been generated from a recent LIDAR and orthophoto survey at the Adina East Lithium Project in
Québec, Canada. These targets are to be followed up in a field campaign this quarter.
Several, high priority targets (6, 7 and 8) have been identified on the western flank of the project (Figure 1 and
Figure 3). The targets are mapped as being in the same metasedimentary rock sequence as those found at the
Loyal Lithium (LLI: ASX) Trieste lithium discovery (5kms west) which has yielded excellent intercepts including
31.8m at 2.2% Li2O. Given the geological setting and whiteness of the outcrops, these targets are interpreted as
having a high probability of being pegmatitic.
Target 8
Target 7
Figure 1: 3D render of digital terrain model (DTM) draped with LIDAR of priority targets (true elevation)
1
2
Loyal Lithium (ASX: LLI) ASX announcement 21st of March 2024
Winsome Resources (WR1: ASX) ASX announcement 19th of October 2023
Pinnacle Minerals Ltd
Issued Capital
Australian Registered Office
Directors
ACN: 655 033 677
ASX: PIM
45,463,317 Shares
44,867,271 Options
Unit 6, Level 1, 389 Oxford Street
Mount Hawthorn WA 6016
T: + 61 8 9426 0666
E: admin@pinnacleminerals.com.au
WILLIAM WITHAM – Non-Executive Chairman
NIC MATICH – Managing Director
LINCOLN LIU – Non-Executive Director
STEPHEN ROSS – Non-Executive Director
www.pinnacleminerals.com.au
On the eastern boundaries of the project, targets 1 through 4 have been identified. These are interpreted to be
a western extension of the Tilly Pegmatites (Figure 2), a discovery made by Winsome Resources (WR1: ASX), which
yielded drill core assay results of 4.68% Li2O over 7m. Further target zones on the northern and western edge of
the project are all located in metasedimentary rocks proximal to the Joubert Suite granitoid body which exhibits
elevated lithium content (140 ppm Li2O)3.
The LIDAR and orthophoto survey technique has previously been successfully used in the discovery of
Spodumene bearing Pegmatites in the James Bay region of Quebec (MRZ: ASX – Bohier Project)4. Given their
relative hardness and typically white colour, the outcrops are more visible on the LIDAR / orthophoto mosaic as
white elevated areas (Figure 1).
The Company is currently in discussions with a local Québec-based geologist to mobilise to the project and
undertake mapping and rock chipping of the targets once a full review of the data has been completed.
Pinnacle Minerals Managing Director, Nic Matich, commented:
“The use of LIDAR coupled with the Orthophoto survey has enabled the Company to rapidly and
cost-effectively identify the most prospective areas of the project. Our exploration team can now
mobilise via helicopter directly to the target outcrops which increases our probability of
discovery.”
Exploration Timeline 2024 (subject to change and pending exploration success):
3
4
Ministère des Ressources naturelles et des Forêts - Geofische Outcrop 2015061604 (Rare metal conversion factor of 2.1527)
Mont Royal Resources (MRX: ASX) ASX announcement 4th of September 2023 & 20th June 2023
www.pinnacleminerals.com.au
2
Figure 2: Targets 1,2,3,4 and 5 on the eastern flank of the project
Figure 3: Targets 6, 7 and 8 on the western flank of the project
www.pinnacleminerals.com.au
3
Background on the Adina East Project
The Adina East Project is located in Québec’s James Bay region (Figure 4) with a total of 147 claims encompassing
72.7km2 (7,274.47 ha) adjacent to an interpreted extension of the Trieste greenstone belt. Located within
Category-III lands, the Adina East Project does not carry any restrictions relating to mining or exploration
according to the James Bay Agreement with the Cree Nation.
The Project is adjacent to Loyal Lithium’s (ASX: LLI) Trieste project where spodumene-bearing dykes with
intercepts including 31.8m at 2.2% Li2O have been drilled less than 6km from the boundary of the Project. Adina
East is also adjacent to Winsome Resources’ Tilly Project where swarming pegmatites have been mapped and
are interpreted to extend into the Adina East Project. The claims are readily accessible throughout the year from
Mirage Outfitters and the Renard diamond mine (75km to the northwest and 45km to the South of the Project
respectively), with the proposed La Grande Alliance eastern road mapped to pass through the Project.
.
Figure 4: James Bay Province Highlighting Adina East Project Location.
www.pinnacleminerals.com.au
4
Assay results from rock chip samples from the Adina East returned lithium enrichment. However, significant
rubidium enrichment, up to 658 ppm was obtained on a granitic pegmatite, indicative of magmatic fractionation
which is a precursor to lithium saturation. Importantly, at Adina East, key “fractionation ratios” of K/Rb below 100
suggest the potential for a spodumene-bearing pegmatite to have been generated, trending northwest into the
project's metasedimentary rocks (Figure 5).
Figure 5: K/Rb Ratios increasing to the northwest- Adina East
www.pinnacleminerals.com.au
5
This announcement has been authorised for release by the Board of Pinnacle Minerals Ltd.
For further information, please contact:
Non-Executive Chairman
William Witham
Pinnacle Minerals Limited
T: + 61 (0) 8 9426 0666
E: admin@pinnacleminerals.com.au
Managing Director
Nic Matich
Pinnacle Minerals Limited
T: + 61 (0) 475 870 345
E: admin@pinnacleminerals.com.au
Media and Investor Inquiries
Jane Morgan
Jane Morgan Management
+61(0) 405 555 618
E: jm@janemorganmanagement.com.au
About Pinnacle Minerals
Pinnacle Minerals Ltd (PIM: ASX) is an ASX listed technology minerals company focused on delivering shareholder
value via the systematic exploration and development of its portfolio of battery and technology metals projects
in Canada, Western Australia and South Australia. Pinnacle aims to deliver exploration success via systematic
and geologically rigorous techniques. The Company’s focus is the “Adina East Project” in James Bay, Quebec which
is proximal to the world class Adina Lithium Project (Winsome Resources: WR1: ASX) and adjacent to the Trieste
Lithium Project (Loyal Lithium: ASX:LLI) and the Tilly Lithium Project (WR1: ASX). The Company’s Australian
exploration assets are prospective for Uranium, Rare Earth Elements and Heavy Mineral Sands.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations,
estimates and projections as of the date on which the statements were made. This forward-looking information
includes, among other things, statements with respect to the Company’s business strategy, plans, development,
objectives, performance, outlook, growth, cash flow, projections, targets and expectations, mineral reserves and
resources, results of exploration and related expenses. Generally, this forward-looking information can be
identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’,
‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’,
‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such statements are
only predictions, and that the Company’s actual future results or performance may be materially different.
Forward looking information is subject to known and unknown risks, uncertainties and other factors that may
cause the Company’s actual results, level of activity, performance, or achievements to be materially different
from those expressed or implied by such forward-looking information.
Competent person statement
The information in this announcement that relates to Exploration Targets, Exploration Results, Mineral Resources
or Ore Reserves is based on information compiled by William Witham, a Competent Person who is a Member of
The Australian Institute of Geoscientists (AIG). William Witham is a director of Pinnacle Minerals Ltd. William
Witham has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
William Witham consents to the inclusion in the presentation of the matters based on his information in the form
and context in which it appears.
www.pinnacleminerals.com.au
6
Figure 6: Pinnacle Minerals Projects' Location Map
www.pinnacleminerals.com.au
7
Appendix 1: Targets referenced in this announcement:
Target ID
Target 1
Target 2
Target 3
Target 4
Target 5
Target 6
Target 7
Target 8
www.pinnacleminerals.com.au
Easting
(NAD83
Zone 18N)
703319
703342
703357
702883
701414
693362
693623
693690
Northing
(NAD83
Zone 18N)
5904178
5904562
5904681
5905076
5906108
5904715
5904900
5904937
8
Appendix 2 JORC Tables
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Drilling
techniques
•
Drill sample
recovery
•
•
•
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
Nature and quality of sampling (e.g., cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g., core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.,
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is oriented
and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged.
If core, whether cut or sawn and whether quarter, half or all
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.,
and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Commentary
•
No sampling undertaken for LIDAR
survey.
•
No drilling results reported.
•
No drilling results reported.
•
No logging of samples undertaken.
•
No sampling results reported.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
www.pinnacleminerals.com.au
9
Criteria
JORC Code explanation
•
Quality of
assay data and
laboratory tests
•
•
•
Verification of
sampling and
assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
•
•
•
•
•
Sample security
•
Audits or
reviews
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g., standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e., lack of bias) and precision
have been established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
The measures taken to ensure sample security.
Commentary
•
No assay results reported.
•
No assay results reported.
•
•
•
LIDAR survey was done using
Projection: MTM
Horizontal Datum: NAD83-SCRS
Vertical Datum: CGVD28
Geoid undulation model used
HTv2.0
No ground control station
Target datum NAD83 Zone 18N
•
Density points for LIDAR: 6-8
•
•
•
pts/m2
•
Photo resolution: 5cm/pixel
•
LIDAR is not orientated with respect
to the geological structures.
•
No samples taken.
The results of any audits or reviews of sampling techniques •
and data.
www.pinnacleminerals.com.au
No independent audits or reviews
of the LIDAR data was undertaken
10
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Commentary
•
•
•
•
•
•
•
Exploration
done by other
parties
•
Acknowledgment and appraisal of exploration by
other parties.
•
•
Geology
•
Deposit type, geological setting and style of
mineralisation.
•
•
Drill hole
Information
•
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
www.pinnacleminerals.com.au
•
•
The Adina East is located in the James Bay
Region of Quebec, Canada.
The Adina East Project is 100% owned by ED
Spod 1 Corp.
Pinnacle Minerals Ltd signed a binding term
sheet on 16th October 2023 to acquire 75%
of the Adina East Project.
The Adina East Project is comprised of 147
claims encompassing 72.7km2 (7,274.47 ha)
Lithium Royalty Corp retains a 2.0% Gross
Revenue Royalty
Noranda Royalties Inc retains a 2.0% Gross
Revenue Royalty, of which 1.0% may be
bought back by the Company at any time for
C$3.0 million.
All claims are in good standing and are
presented in this announcement.
Geological datasets were sourced from
Ministère des Resources Naturelles et des
Forêts (MERN), the Quebec geological
survey.
No other data by prior explorers is known to
the company.
The Adina East claims are located within the
La Grande sub-Province, in the east-central
Archaean Superior Craton, Canada. The
Superior Craton is a stable crustal block
covering Quebec, Ontario, and southeast
Manitoba in Canada.
Locally the stratigraphy consists of the
Salomon River Formation which is
Neoarchean in age and is described as a
Centimetric porphyroblastic wacke
paragneiss ± cordierite ± staurolite ± garnet
± sillimanite.
No drillholes have been reported.
No relevant material data has been
excluded from this report.
11
Criteria
JORC Code explanation
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
Diagrams
•
Balanced
reporting
•
Other
substantive
exploration
data
•
Further work
•
•
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g., cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g., ‘down hole length, true width not known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating substances.
The nature and scale of planned further work (e.g.,
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
www.pinnacleminerals.com.au
Commentary
•
There have been no data aggregation
methods applied as no intervals were
reported.
•
No mineralisation widths have been
reported.
•
Figures and plans are displayed in the main
text of the release.
•
No assay results have been reported.
All information has been provided as
available
• Interpretation of potential pegmatite
occurrences was made using the LIDAR
(Digital Elevation Model) and airphotos
based on the following criteria:
o White / light colour
o Positive topographic feature
o Located within mapped metasediments
•
•
•
A mapping and sampling program is
planned to confirm the LiDAR interpretation.
Maps show the target areas for follow-up
work. These are based on potential
pegmatite density.
12
Share your feedback
Discover