Quarterly Activity and Cashflow Statement
Released
Released
Announcement PDF
ASX Announcement
17 July 2024
QUARTERLY REPORT FOR THE PERIOD ENDING 30 June 2024
HIGHLIGHTS
•
Ninety-five (95) aircore holes for 2,067m completed at Capel Mineral Sands Project
•
First batch of heavy mineral (HM) assays (26 holes) from Capel Mineral Sands Project received
Highlights Include1:
•
o
3.4% HM over 7m from 16m downhole including 2m at 7.9% HM (CAP023)
o
3.0% HM over 5m from 19m downhole (CAP011)
o
2.9% HM over 6m from 3m downhole (CAP002)
o
13.1% HM over 1m from 19m downhole (CAP002)
LIDAR and orthophoto survey at Adina East Lithium Project in Quebec to identify potential
lithium-bearing pegmatite outcrops completed with analysis ongoing
•
Analysis of drill core for rare earth elements from historical holes drilled at Wirrulla Project
(South) underway with REE assay results expected Q3 2024
o
•
Targeting clay horizons with ionic absorption Rare Earth Element (REE) mineralisation
Strong financial position with a cash balance of AU $1.527m as at 30th of June 2024
Pinnacle Minerals Ltd (ASX: PIM) (“Pinnacle”, or the “Company”) is pleased to provide the following update on
its activities for the quarter ending 30 June 2024 (“Quarter”, “Reporting Period”).
During the Reporting Period, the extension and infill drilling testing program by PIM of historical, wide-spaced
drilling, intercepted shallow and broad zones of HM mineralisation over an interpreted strike length of up to
three (3) kilometres. The first batch of assays were returned to the Company, with all holes intersecting HM
mineralisation from surface. Notable intersections include 2.8% HM over 9m from 15m downhole (CAP023)
with high grade intercepts of 13.1% HM over 1m (CAP002).
The drilling program was designed to test two mineralised trends: an older, deflected shoreline and a younger
shoreline that maintains a more consistent northeasterly trend as evidenced in historical drilling results. The
program was conducted with the goal of defining an ilmenite (titanium ore) dominated heavy mineral resource
with accessory zircon and rutile.
Per the Company’s announcement on the 28th of May 2024, the company’s contractor completed an airborne
LIDAR survey over the entire Adina East Lithium Project in Québec. High resolution orthophotos acquired
simultaneously with the LIDAR readings will be draped over the digital elevation model (DEM), enabling the
identification of potential pegmatite outcrops which often show up as “evident” white elevated “areas”, as
tested by Pinnacle’s contractor on numerous other projects. These outcrops can then be targeted directly
minimising the costly “prospecting” process which involves personnel visiting each claim in the project without
predefined targets.
1
Intervals reported at 1.0% THM cutoff
Pinnacle Minerals Ltd
Issued Capital
Australian Registered Office
Directors
ACN: 655 033 677
ASX: PIM
45,463,317 Shares
44,867,271 Options
Unit 6, Level 1, 389 Oxford Street
Mount Hawthorn WA 6016
T: + 61 8 9426 0666
E: admin@pinnacleminerals.com.au
WILLIAM WITHAM – Non-Executive Chairman
NIC MATICH – Managing Director
LINCOLN LIU – Non-Executive Director
STEPHEN ROSS – Non-Executive Director
www.pinnacleminerals.com.au
Also during the quarter, the Company contracted Challenger Geological Services to conduct pXRF analysis of
forty seven (47) historical drill cores held at the Tonsley core library in Adelaide. The results from the analysis
were used to select twenty-one (21) intervals from drill holes located within the footprint of the Narlaby
Paleochannel for follow up assay and leach testing at ALS. The aim of the testing is to determine the potential
for clay-hosted REE mineralisation.
Pinnacle Minerals Managing Director, Nic Matich, commented:
“The second quarter of 2024 saw Pinnacle act on its 2024 exploration plan which included the maiden
2,067m, 95-hole drilling campaign at the Capel Mineral Sands Project, which successfully intercepted
broad zones of HM over an interpreted strike length of 3km. Pinnacle also progressed the Adina East
Lithium Project with the completion of a project wide LIDAR survey. Pinnacle remains committed to its
key projects whilst also noting that prudent capital management is critical in this difficult market.”
Figure 1: Capel Mineral Sands Project - Drill collars referenced in this announcement
www.pinnacleminerals.com.au
2
Exploration Timeline 2024 (subject to change and exploration success):
www.pinnacleminerals.com.au
3
OPERATIONS
Canada (Adina East: Lithium)
Background on the Adina East Project
The Adina East Project is located in Québec’s James Bay region (Figure 2) with a total of 147 claims encompassing
72.7km2 (7,274.47 ha) adjacent to an interpreted extension of the Trieste greenstone belt. Located within
Category-III lands, the Adina East Project does not carry any restrictions relating to mining or exploration
according to the James Bay Agreement with the Cree Nation.
The Project is adjacent to Loyal Lithium’s (ASX: LLI) Trieste project where spodumene-bearing dykes with
intercepts including 31.8m at 2.2% Li2O2 have been drilled less than 6km from the boundary of the Project.
Adina East is also adjacent to Winsome Resources’ Tilly Project where swarming pegmatites have been mapped
and are interpreted to extend into the Adina East Project. The claims are readily accessible throughout the year
from both the Mirage Outfitters base and the Renard diamond mine (75km to the northwest and 45km to the
South of the Project respectively), with the proposed La Grande Alliance eastern road also mapped to pass
through the Project.
.
Figure 2: James Bay Province Highlighting Adina East Project Location.
2
Loyal Lithium (ASX: LLI) ASX announcement 21st of March 2024
www.pinnacleminerals.com.au
4
Assay results from rock chip samples collected late last year from the Adina East returned lithium enrichment.
However, significant rubidium enrichment, up to 658 ppm was obtained on a granitic pegmatite, indicative of
magmatic fractionation which is a precursor to lithium saturation. Importantly, at Adina East, key “fractionation
ratios” of K/Rb below 100 suggest the potential for a spodumene-bearing pegmatite to have been generated,
trending northwest into the project's metasedimentary rocks (Figure 3).
Figure 3: K/Rb Ratios increasing to the northwest- Adina East
www.pinnacleminerals.com.au
5
Adina East Lithium Project - Activities
During the Reporting Period, the Company completed a LIDAR survey of the entire Adina East Lithium Project
in Québec. High resolution orthophotos taken simultaneously with the LIDAR readings will be draped over the
digital elevation model (DEM), enabling the identification of potential pegmatite outcrops which often show up
as “evident” white elevated “areas” (Figure 4), as tested by Pinnacle’s contractor on numerous other projects.
These outcrops can then be targeted directly minimising the costly “prospecting” process which involves
targeting each claim in the project without defined targets.
Pegmatite outcrop
Figure 4: Example of successful identification of a pegmatite outcrop (ASX: MRZ - Bohier Project)
Figure 5: Photo from LIDAR survey plane viewing northwards into the Adina East Lithium Project
www.pinnacleminerals.com.au
6
South Australia (Wirrulla: Uranium & REE)
Background on the Wirrulla Project
The Wirrulla Project (EL 6968) is 957km2 of tenure in the northwestern extents of the Eyre Peninsula, South
Australia. The project is centred on a circular magnetic feature resembling a Mount Weld-style intrusion and
was applied for in July 2023 primarily for its’ rare earth element (REE) potential which was identified from
historical drilling intercepts where elevated apatite > 10% (typical in carbonatites) were intercepted3.
The REE ionic absorption potential of the Narlaby palaeochannel has also been identified by Cobra (LON: COBR)
who have defined the Boland Ionic Rare Earth Project which is hosted with-in the palaeochannel. Cobra has
recently acquired tenements EL6966 and EL6967 which cover a substantial portion of the palaeochannel.
Desktop studies undertaken whilst the tenement was under application have highlighted the uranium
prospectivity in the northern extents of the tenement where the uranium-bearing Narlaby paleochannel is
mapped continuing into the tenement. The palaeochannel hosts high grade uranium mineralisation at
Yarranna only 10km from the targets identified by satellite and radar imagery analysis conducted by Pinnacle.
Wirrulla Project – Activities
During the quarter the Company contracted Challenger Geological Services to conduct pXRF analysis of fortyseven (47) historical drill cores held at the Tonsley core library. The results from the analysis were used to select
twenty-one (21) intervals from drill holes located within the footprint of the Narlaby Paleochannel for follow up
assay and leach testing at ALS. The aim of the testing is to determine the potential for clay hosted REE
mineralisation. The results from the assay analysis are expected in the third quarter of 2024.
3
Open File Envelope Number 8981, EL 1952 Carawa, Annual and final report for the period 27/7/94 to 22/11/95
www.pinnacleminerals.com.au
7
Figure 6: Wirrulla Project highlighting uranium mineralisation and targets
www.pinnacleminerals.com.au
8
Western Australia (Capel: Heavy Mineral Sands)
Background on the Capel Project
The project was previously held by Iluka Resources Limited (Iluka) and more recently Tronox Limited (NYSE:
TROX), a global, vertically integrated producer of titanium dioxide and inorganic chemicals, with a US $2b
market capitalisation.
Regional-scale exploration, conducted in 2010 by Iluka, discovered moderate-grade HM from surface on several
drill lines and a previously un-discovered palaeo-shoreline at about 8m above current sea level. No further
work on this very prospective trend is recorded.
Assay of the Ruabon (Capel) shoreline by Iluka returned HM grades to 10.8% within the 350m-wide shoreline
that is evident over a 5km strike length in historic drilling. Importantly the new shoreline appears to deflect
around a basalt flow (palaeo-headland) observed in regional aeromagnetic images. These basalt flows are
critical in focussing and trapping HM enrichment in many of the large deposits of the Southwest and Scott
Coastal Plain (e.g. Yoganup, Yoganup Extended, Tutunup South, Jangardup). Pinnacle believes there is potential
for defining cohesive mineralisation at a more local scale, sufficient for delineating a material mineral resource
within the tenement.
Key intercepts at Ruabon (Capel) include4:
•
21m at 3.3% HM from surface (including 9m @ 6.1% from 11m) in RB007
•
21m at 2.6% HM from surface (including 2m @ 9.6% from 8m) in RB001
•
18m at 2.2% HM from surface in RB003
Capel Project – Activities
During the Reporting Period, Pinnacle completed a 2,067m ninety-five (95) hole aircore drilling program at the
Capel Mineral Sands Project (Figure 7). The campaign encountered coherent mineralisation and was completed
ahead of schedule, within six (6) days. The program was designed to test two mineralised trends: the older,
deflected shoreline and a younger shoreline that maintains a consistent northeasterly trend in historic drilling
results. The aim of the drilling program was to define an ilmenite dominated heavy mineral resource with
accessory zircon and rutile.
Samples were sent to Diamantina Laboratories in Malaga WA where they were subjected to a heavy liquid
separation analysis to determine sample composition and total heavy mineral (THM) content. Initial assays
confirmed that the program intercepted shallow and broad zones of HM mineralisation over an interpreted
strike length of up to three (3) kilometres. The first batch of assays were returned to the Company in late June,
with all holes intersecting HM mineralisation from surface. Notable intersections included 2.8% HM over 9m
from 15m downhole (CAP023) with high grade intercepts of 13.1% HM over 1m (CAP002).
A full summary of the assay results returned during the quarter can be found in Pinnacles’ ASX announcement
released to the market on 25 June 2024.
4
Wamex Report Number A97325
www.pinnacleminerals.com.au
9
Figure 7: Capel Mineral Sands Project - Drill Collar Locations
www.pinnacleminerals.com.au
10
CORPORATE
During the quarter the Company undertook a strategic review of its operations and took various actions to
conserve capital, reduce discretionary expenditure and streamline exploration activities.
Pinnacle surrendered the following tenements:
Project
Holly
Bobalong
Tambellup
White Knight
Lac Rug
Lac Bigniba
Location
WA
WA
WA
SA
Canada
Canada
Tenement / Claims
E70/5690 and E70/5676
E70/6440 and E70/6441
E70/5348 and E70/5347
EL6789, EL6790, EL6791, EL6939
Multiple claims
Multiple claims
Subsequent to the reduction in tenure, Mr. Bill Witham transitioned to Non-Executive Chairman.
Cash Position
Pinnacle maintained a strong cash position at Quarter’s end, with a cash balance of A $1.527 million.
This announcement has been authorised for release by the Board of Pinnacle Minerals Ltd.
For further information, please contact:
Non-Executive Chairman
William (Bill) Witham
Pinnacle Minerals Limited
T: + 61 (0) 475 870 345
E: admin@pinnacleminerals.com.au
Managing Director
Nic Matich
Pinnacle Minerals Limited
T: + 61 (0) 475 870 345
E: admin@pinnacleminerals.com.au
Media and Investor Inquiries
Jane Morgan
Jane Morgan Management
+61(0) 405 555 618
E: jm@janemorganmanagement.com.au
www.pinnacleminerals.com.au
11
About Pinnacle Minerals
Pinnacle Minerals Ltd (ASX: PIM) is an ASX listed technology minerals company focused on delivering
shareholder value via the systematic exploration and development of its portfolio of battery and technology
metals projects in Canada, Western Australia and South Australia. Pinnacle aims to deliver exploration success
via systematic and geologically rigorous techniques. The Company’s focus is the “Adina East Project” in James
Bay, Quebec which is proximal to the world class Adina Lithium Project (Winsome Resources: ASX: WR1) and
adjacent to the Trieste Lithium Project (Loyal Lithium: ASX: LLI) and the Tilly Lithium Project (ASX: WR1). The
Company’s Australian exploration assets are prospective for Uranium, Rare Earth Elements and Heavy Mineral
Sands.
Forward Looking Statements
This announcement contains ‘forward-looking information’ that is based on the Company’s expectations,
estimates and projections as of the date on which the statements were made. This forward-looking information
includes, among other things, statements with respect to the Company’s business strategy, plans,
development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations,
mineral reserves and resources, results of exploration and related expenses. Generally, this forward-looking
information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’,
‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’,
‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this announcement are cautioned that such
statements are only predictions, and that the Company’s actual future results or performance may be
materially different. Forward looking information is subject to known and unknown risks, uncertainties and
other factors that may cause the Company’s actual results, level of activity, performance, or achievements to
be materially different from those expressed or implied by such forward-looking information.
Figure 8: Pinnacle Minerals Projects' Location Map
www.pinnacleminerals.com.au
12
ASX Additional Information
1.
ASX Listing Rule 5.3.1 – Mining exploration activities and investment activity expenditure during the quarter was
$276,000. Full details of the activity during the quarter are set out in this report.
2.
ASX Listing Rule 5.3.2 – Mining production and development activity expenditure for the quarter was Nil and
there were no substantive mining exploration activities for the quarter.
3.
ASX Listing Rule 5.3.3 – Tenement Schedule
Australia:
Project
Holder
State
Tenement
Status
Percentage Held
Capel
Wirrulla
Pinnacle Minerals Ltd
REE Exploration Pty Ltd
WA
SA
E70/6372
EL 6968
Granted
Granted
100%
100%
Canada: Adina East Project (75% ownership)
Title Number
NTS Sheet
Area (ha)
Acquisition Date
Anniversary
Date
2690971 - 2690982
23E04
619.26
21/11/2022
20/11/2025
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
2690984 - 2691013
23E04
23E05
33H01
1,547.88
21/11/2022
20/11/2025
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
2691015 - 2691029
33H01
774.34
21/11/2022
20/11/2025
2691031 - 2691060
33H01
33H08
1,548.19
21/11/2022
20/11/2025
2691062 - 2691076
33H08
773.71
21/11/2022
20/11/2025
2691078 - 2691096
33H08
979.71
21/11/2022
20/11/2025
2692398 - 2692408
23E05
567.26
24/11/2022
23/11/2025
2692410 - 2692418
33H08
464.12
24/11/2022
23/11/2025
4.
Registered Holder
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
Pinnacle Minerals James Bay Ltd 75%
ED Spod 1 Corp 25%
ASX Listing Rule 5.4.5 – Payments to related parties of the Company during the quarter and outlined in Appendix
5B include $98,000 for Salaries, Director Fees and Consulting Fees paid to Directors.
www.pinnacleminerals.com.au
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Pinnacle Minerals Limited
ABN
Quarter ended (“current quarter”)
52 655 033 677
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
Year to date
(12 months)
$A’000
-
707
(276)
(1,102)
(63)
(486)
20
87
(319)
(794)
(90)
(90)
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
(90)
(90)
-
-
Cash and cash equivalents at beginning of
period
1,864
2,406
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(319)
(794)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(90)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(18)
5
4.6
Cash and cash equivalents at end of
period
1,527
1,527
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
527
464
5.2
Call deposits
1,000
1,400
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,527
1,864
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
98
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Fees include Salaries, Director Fees and Consulting Fees to Managing Director and Non-Executive Directors
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
$A’000
319
319
1,527
1,527
4.8
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
17 July 2024
Date:
...................................................................................
Authorised by: The Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover